Avantor in Gliwice (Poland) delivers chemical products and materials for laboratories. The installation of their business premises provided some interesting challenges, which Walraven were able to professionally resolve.
There was very little space to work, for which a solution had to be found. Properly functioning ventilation ducts had to be installed. But we could not attach them to the floor or walls. Therefore Avantor asked Walraven for help
Our ‘normal’ solutions, Walraven Yeti and Walraven Urus, could not be used here, therefore we opted for our heaviest system: Walraven Maxx profile. With this system, we installed the big ventilation ducts above each other in layers. These were attached to the main substructure of the building because the floor and walls were not available.
We produce the materials used ourselves, which meant we could supply everything to the location at Avantor within 48 hours. This saved the customer a lot of time. Besides our speed of service, Avantor were also very pleased about the fact that we fully prepared and completed everything ourselves. From estimating to execution, we provided all the information and performed all the work.
Do you also have a considerable challenge with the installation of your project? Our staff will gladly help you with sound advice and choosing the right products. Please contact us on: tel:+37061651341 or [email protected].