Avantor in Gliwice (Poland) delivers chemical products and materials for laboratories. The installations at their facilities proved to be challenging, but Walraven was able to complete the job professionally and efficiently.
There was very little space to work, for which a solution had to be found. Properly functioning ventilation ducts had to be installed. But they could not be attached to the floor or walls. That’s when Avantor asked Walraven for help.
Our normal solutions, Walraven Yeti and Walraven Urus, could not be used here, therefore we opted for our heaviest system: Walraven Maxx. With this system, we installed the big ventilation ducts above each other in layers. These were attached to the main substructure of the building.
Since we produce the materials used, we could deliver everything to the location at Avantor within 48 hours. This saved the customer a lot of time. From estimating to execution, we provided all the information and performed all the work.
Do you also have a considerable challenge with the installation of your project? Our staff will gladly help you with sound advice and choosing the right products. Please call us, 800-610-5056, or email us at: [email protected].